China 8-cubic-meter coal injection tank (pulverized coal injection tank) - China Supplier China 8-cubic-meter coal injection tank (pulverized coal injection tank) - China Supplier China 8-cubic-meter coal injection tank (pulverized coal injection tank) - China Supplier China 8-cubic-meter coal injection tank (pulverized coal injection tank) - China Supplier China 8-cubic-meter coal injection tank (pulverized coal injection tank) - China Supplier

8-cubic-meter coal injection tank (pulverized coal injection tank)

¥6000
Others


Contact Info
  • Chengdu Road, Rizhao Economic and Technological Development Zone, 276800
  • 赵文广
  • 18063391730

Xiangye Injection Tank (Pulverized Coal Tank) 8 Cubic Meter Product Information and Technical Specifications are as follows:
1. Product Parameters
Basic Parameters‌
Volume: 8 cubic meters (model marked as Xypc-8)‌
Weight: 200-300kg (varies by configuration)‌
Material: Carbon steel, wall thickness 5mm, working pressure 0.8-1.3MPa‌
Applicable Scenarios: Blast furnace pulverized coal injection system and pneumatic conveying system‌


Performance Features‌
Supports direct/indirect injection methods, with large and stable air volume‌
Complies with the requirements of GB 16543-2025 "Explosion-proof Safety Specification for Blast Furnace Pulverized Coal Injection System"‌

2. Safety and Installation Requirements
Safety Specifications‌
Explosion-proof devices, pressure gauges and sealing performance shall be inspected regularly to prevent pulverized coal leakage or
Operators must hold valid certificates and receive special training on pulverized coal explosion prevention‌


Installation Key Points‌
The bearing capacity of the foundation shall be ≥150kPa, and the distance between the tank and the wall shall be ≥0.8m to ensure heat dissipation‌
The distance between supporting equipment (such as dryers and filters) is recommended to be 2-3 meters to reduce pressure loss‌


3. Market and Maintenance
Maintenance Cycle‌: It is recommended to conduct a comprehensive inspection every quarter, including non-destructive testing of welds and calibration of safety valves‌
Note: Specific technical details shall be subject to the "Safety Technical Regulations for Pulverized Coal Injection Tanks" provided by the manufacturer‌.

Others
About Toocle.com -  Toocle Partnership -  Toocle Services -  Toocle Agents
Copyright © Toocle.com. All Rights Reserved.
(浙)-经营性-2023-0192
ChatGlobal TChat